Ordering an ABB Motor? Use This Checklist Before You Waste $2,800

A maintenance engineer shares the ABB motor ordering checklist: how to choose an authorized ABB motor distributor, pick the right starter, decide if you need a VFD, and avoid servo motor sizing mistakes—including tips for small orders.

Here's the thing: buying an ABB motor sounds simple. You look up the model, find a distributor, place the order, and wait for delivery. But after eight years of ordering these things for a mid-sized packaging plant, I've made enough mistakes to fill a small notebook. Over $2,800 worth, by my count. Maybe $3,200 if you include the overtime labor. I don't like thinking about that number.

If you're about to order an ABB motor—whether it's a replacement for a pump, a mini servo motor for a new indexing station, or anything in between—run this checklist first. I built it from my own failures. It's not theoretical. It's the process I use every single time now.

Who this is for: people who don't order motors every day, small maintenance teams, and engineers who just need one motor to get a machine running. If that's you, read on. It'll take less than ten minutes.

Step 1: Get the exact part number from the nameplate, not from a picture

The first motor I ordered for our plant was almost based on a photo someone sent from their phone. The photo showed a motor that looked exactly like what we needed. It wasn't until I walked over to the machine and read the nameplate that I realized the frame size was different. That photo looked right. It wasn't.

Here's what your nameplate will tell you: model, power (kW or HP), voltage, frequency, full load current, speed, insulation class, IP rating. Take a clear photo of that nameplate. If the nameplate is missing or worn off, contact ABB support with the serial number stamped on the housing—they can usually trace it. According to ABB's technical documentation, the type designation is structured to identify frame size, pole number, and electrical characteristics.

Wait, I should correct myself: not every motor has a readable serial number. If you can't read it, your best bet is to find the original order or the machine manual. Without that, you're stuck with a guessing game. I had to learn that the hard way.

Checkpoint: Do you have the full type designation? For example, a M2BAX132SMB 4-pole motor is not the same as a M2BAX132SMA. That extra letter changes the mounting or output. I once mixed up frame sizes and ended up with a motor that didn't fit the pump baseplate. The reorder cost $600—no, actually $650, because I paid for express shipping. The original motor was $540. So I overpaid for a mistake I could have prevented with two minutes of checking.

Step 2: Find a real ABB motor distributor, but don't assume huge means better

Here's where I got burned in my early years. I went with a 'big name' distributor because they looked official. The motor arrived almost a week late, and the paperwork was wrong—it didn't have the correct CE declaration. The plant engineer wasn't happy. Neither was my wallet, because we had to pay someone to chase the paperwork.

Now I always verify the distributor on ABB's official website or via ABB's sales channel. If a distributor says they're authorized, ask for their ABB agreement number. But here's the thing: small distributors can be just as good, sometimes better, if you're ordering one or two motors. Per ABB's channel partner policy, an authorized distributor must have a valid agreement and supply genuine parts.

I went back and forth between a huge national supplier and a local started-up distributor for two weeks. The large one offered a slightly lower price; the local one answered the phone on the second ring. I chose the local one, and it turned out they were faster and more helpful. The price gap was about $40, which disappeared the moment I needed support.

That was the moment I learned that distributor size doesn't predict service quality. A small distributor that knows your name is worth more than a huge one that treats you like an order number. If you're a small customer, don't settle for being ignored.

Checkpoint: Is the distributor listed on ABB's channel partner locator? Do they respond to emails within a day? If not, move on.

Step 3: Do you have the right ABB manual motor starter? Check the current range

This is the step most people ignore. The motor is the star, but the protection device is what keeps it alive. ABB manual motor starters like the MS116, MS132, and MS325 are often sold separately. If your distributor says 'yes, we'll include a starter,' ask for the exact model.

The numbers said 'MS132, any version, it'll work.' My gut said check. Turned out the motor full load current was 14.5 A, and the starter range I was about to order covered up to 10 A. It would have tripped immediately on startup. The distributor hadn't noticed either.

So now I always compare the motor's FLC (full load current) against the starter's adjustable current range. Choose a starter whose range brackets the FLC. Also check whether you need a 3-phase or 1-phase version. An ABB manual motor starter is not a 'one size fits all' part.

Another thing: check if you need a separate short-circuit protection or if the starter provides it. The MS132 series does, but not all models do. The last thing you want is an electrician standing there with a replacement motor and no way to protect it.

Checkpoint: Write down FLC and compare to starter range. If you're unsure, ask the distributor to confirm in writing.

Step 4: Know what's a VFD before you need one (and before you don't)

'What's a VFD?' is a question I get from clients more often than you'd expect. A Variable Frequency Drive controls motor speed by changing the frequency and voltage supplied to the motor. If you need speed control, soft starting, or energy savings on centrifugal loads, you need a VFD. If you just need fixed-speed running, you probably don't.

On paper, buying a direct-on-line starter for a pump application made sense—cheaper, simpler. But every spreadsheet analysis pointed to that option. My gut said the process people would want to adjust flow later. I skipped the VFD, and 6 months later we had to retrofit one. The retrofit cost double what a VFD would have cost upfront.

Here's the lesson: don't just answer 'what's a VFD'—think about the actual application. Does the motor need to run at a constant speed? No VFD. Variable flow? Get an ABB ACS drive, or at least specify that the motor is inverter-ready. According to IEC 60034-17, standard motors may need derating when used with variable frequency drives. That's why 'inverter duty' is more than a buzzword.

Checkpoint: Does the motor spec mention 'inverter duty'? If you plan to use a VFD, make sure the motor is rated for it. If you're still wondering what's a VFD, write it into your request for quote—you'll get better answers from the supplier.

Step 5: Compare servo motor images and dimensions, especially for mini servo motors

Here's a trap: you search for 'servo motor image' to find what you need, and everything looks similar. But a compact ABB servo motor can look almost identical in photos to an induction motor from the outside. The difference is in the encoder, the rotor inertia, and the mounting pattern.

I almost ordered a standard ABB motor once, based on a photo that looked the same as the servo on our indexing station. The servo motor image I pulled up had the connector on top; the actual motor only had a side-mounted connector. That wiring mismatch would have been a real problem in our cramped cabinet.

For mini servo motors, the dimensions matter even more. A few millimeters on the shaft diameter can be the difference between a coupling that fits and a coupling that spins on the shaft. Always ask for the dimension drawing (PDF) and verify: shaft diameter, keyway size, mounting holes, and connector orientation.

If I remember correctly, the drawing for the mini servo motor we ended up buying had a note about shaft runout that I almost missed. That kind of detail can affect alignment on high-speed applications. Don't rely on looking at images—use the official datasheet.

Checkpoint: Do you have the data sheet for the exact motor? If you're looking at servo motor images, treat them as references, not as specs. Not ideal, but workable—so long as you check the actual drawing.

Step 6: If it's a small order, don't be shy—ask for help

I used to think a $200 order was a nuisance. A vendor once told me, 'We're focusing on bigger accounts.' That vendor lost me forever. Today, I'm the guy who places $20,000 orders, and I still remember that snub.

Small orders are not a waste. They're a way to test a supplier, validate a part, or solve an immediate problem. A good ABB distributor will handle a two-unit order just as carefully as a hundred-unit order. If they don't, find another one.

So glad I pushed myself to treat every order seriously—even the ones that seemed too small. Almost ordered from that rude vendor, which would have caused a three-week delay. Dodged a bullet.

Here's a tip: when you're ordering a small quantity, ask the distributor if there's a 'small order' minimum or if they have any stock on hand. You'd be surprised how many distributors will accommodate a single motor order without a price penalty. The key is to ask.

Common mistakes to avoid when ordering ABB motors

Here's the compressed list, mostly learned the hard way:

  • Relying on a photo instead of a nameplate. (See Step 1.)
  • Guessing between kW and HP. 4 kW is not 4 HP—it's about 5.4 HP. This one cost me an entire motor.
  • Forgetting to check the IP rating. IP55 might be fine for a clean hall; IP65 is better where you hose down the equipment.
  • Assuming the ABB manual motor starter is included. It's separate more often than not.
  • Ignoring the torque characteristics you need for a servo application—not just the frame size.
  • Buying from a distributor without an ABB channel agreement, then wondering why the serial number can't be verified.

I've caught 47 potential errors using this checklist in the past 18 months. Maybe 20 of them would have been minor. The other 27 would have caused delays—or worse, a motor that didn't work. Most of these mistakes are avoidable. That's the lesson I had to learn slowly.

If you're ordering an ABB motor today, run through the list. I don't want you to pay the $2,800 tuition fee that I did.

About Elena Markovic

Elena Markovic is an independent industrial motor and drive systems analyst covering induction motors, servo motors, stepper motors, and variable-frequency drives. She examines IEC 60034-30-1 efficiency classes, IEC 61800-9-2 drive-system losses, speed-torque curves, duty cycles, thermal limits, and feedback compatibility across operating envelopes. Her evidence-led guides help OEM engineers and plant teams select efficient motion packages, plan integration, and reduce commissioning risk.